Our memorial day weekend was spent readying our boat and controller for the navy. Out boat and controller were ready to be tested outside after we had driven it around lab indoors last night. When we got the water we were very glad we made the height of the deck adjustable, as the water level seems to have risen. After using some teamwork to adjust the height (left) we have a drivable vehicle in Terman pond! The flip flop below will be replaced by our ballon holder. Now we just need to package our controller nicely and start swapping controllers and boats with other teams.